The first task is to remove the railings on the bridge to Gord's store, replace some of the 9' long planks with 10' long planks, then re-install the railings so they are located further apart. This will give 1-foot of additional room for the widest ATV's that pass over the bridge. The second task is to add runners to the bridge.
Please bring the following tools: work gloves, hammer, flat bar, crow bar and cats paw for removing the nails from the railings. Bring a rechargeable drill in case we run into screws that have to be removed. We may also need a drill to install some timber lags.
We will have two nail guns on hand to reinstall the railings and the runners.