There will be a short trail work day on Saturday August 22 starting at 8:30am at the log yard at end of Bob Benson's road. The goal of this trail work day is to build the safety deck between the bridge mats on the 33' bridge (see attached image). If we get enough help, we should be done in 2 hours. Please bring the following items: battery powered drill with Phillips head, regular hammer and large sledge hammer (in case we need to nudge the mats). I will prep all of the safety deck supports ahead of time so installation can start as soon as we get there. Thanks, Larry 603-636-1404 (home) 603-684-8196 (cell) Directions by car or ATV: Take Rt. 110A north to Rt. 110B Take Rt. 110B east for 1.25 miles Take a right on Bob Benson's log road Follow gravel road 1.25 miles to log yard. Bridge is at the east end of the log yard.